Blog Archives

Commercial – Western Challenge

Commercial Case Study for Western Challenge HA.

This is 90 x 6KW Air to Air Heatpumps installed into 1 and 2 bedroom apartments.

This entry was posted in Case Studies, Renewable, Renewable Energy. Bookmark the permalink.

Leave a Reply